This annual ticketed event is sponsored by Racing Systems, Inc and includes a half marathon, 10K and 5K. The event will have pre and post event activities on the Felix H. Lozada, Sr. Gateway. Food and beverage (alcoholic) will be provided. Onsite packet pickup and day race registration opens at 5:30 a.m., amplified sound will begin at 6:40 a.m. and the volume must be maintained at or below 70% of the volume planned for 8 a.m. The half marathon, 10K and 5K begin and end on the Felix H. Lozada, Sr. Gateway. The routes include rolling closures; streets will close 15 minutes ahead of participants and reopen as the last participant passes through.The half marathon starts at 7 a.m., proceeds west on Canada Drive (dedicated westbound lanes), right on Hampton Road/Inwood Road (northbound lane), right on Lupo Drive, immediate right on Memphis St., continuing on Mississippi Avenue/Quaker Street, right onto Irving Boulevard (dedicated eastbound lanes), right on Sylvan Avenue (southbound lane), right on the Sylvan Avenue ramp to Trammell Crow Park, left on the Trinity Skyline Trail, right on the Trinity Levee Trail, U-turns on Trinity Levee Trail past W. Commerce Street, returns down Trinity Levee Trail, left on Trinity Skyline Trail, right on the Sylvan Avenue ramp, right on Sylvan Avenue (southbound lane), right on Morris Street, right on Vilbig Road, right on Canada Drive, and finishing in the Ronald Kirk Pedestrian Bridge parking lot. The 10K starts at 7 a.m., proceeds west on Canada Drive (dedicated westbound lanes), right on Hampton Road/Inwood Road (northbound lane), right on Lupo Drive, immediate right on Memphis St., continuing on Mississippi Avenue/Quaker Street, right onto Irving Boulevard (dedicated eastbound lanes), right on Sylvan Avenue (southbound lane), left on Morris Street, right on Canada Drive, and finishing in the Ronald Kirk Pedestrian Bridge parking lot. The 5K starts at 7:15 a.m., proceeds west down Canada Drive from the Ronald Kirk Bridge parking lot, U-turns on Canada Drive before Calypso St., and returns down Canada Drive back to the finish line at the Ronald Kirk Bridge parking lot. Setup begins at 9 a.m. Friday, April 22 with the installation of tents (twelve - 10’ X 10’ and two -10’ X 20’) and port-o-lets. Teardown will be complete by 2 p.m. and street closure apparatus will be removed by 12:30 p.m.
Street Name |
From |
To |
# of Lanes |
Start Time |
End Time |
Canada Dr |
Gulden Ln |
Hampton Rd |
All |
6:45 a.m. |
11:30 a.m. |
Hampton Rd / Inwood Rd |
Calypso St. |
Lupo Dr. |
Northbound |
7 a.m. |
10 a.m. |
Lupo Dr. |
Inwood Rd |
Memphis St |
1 |
7 a.m. |
10 a.m. |
Memphis St. / Mississippi Ave. / Quaker St. |
Lupo Dr. |
Irving Blvd |
1 |
7 a.m. |
10 a.m. |
Irving Blvd. |
Quaker St |
Sylvan Ave |
Eastbound |
7:15 a.m. |
10:30 a.m. |
Morris St - Westbound |
Sylvan Ave |
Vilbig Rd |
1 |
7:30 a.m. |
11 a.m. |
Vilbig Rd. |
Morris St |
Canada Dr |
1 |
7:30 a.m. |
11 a.m. |
Morris St. - Eastbound |
Sylvan Ave |
Canada |
All |
7:30 a.m. |
11 a.m. |
Sylvan Ave. |
Irving Blvd |
Morris St - Westbound |
Southbound |
8:00 a.m. |
11 a.m. |